Another day, another update to the Building Code. Understanding the changes to the H1 building code (and the changes to the changes) can be complex. Here we look at the details and specifications to make sure you’re up to speed and compliant when considering your next building project.
In November 2021, the Ministry of Business, Innovation and Employment (MBIE) announced changes to the Building Code with the aim of making new homes and buildings more energy efficient. The documents outline compliance pathways to meet minimum insulation requirements for new housing set out in clause H1 Energy Efficiency of the New Zealand Building Code. The changes to the insulation requirements represent the first step towards MBIE’s Building for Climate Change programme. This initiative will deliver warmer, drier, and healthier homes that cost significantly less to heat and will also generate carbon savings through energy efficiency.
What type of buildings does the update cover?
The scope of H1/AS1 has been reduced to cover only housing, and buildings other than housing less than 300 m2. Requirements applicable to buildings other than housing over 300 m2 have been combined into the new Acceptable Solution H1/AS2.
Climate zone changes
MBIE has expanded the number of climate zones used in the insulation requirements from three to six. This will allow the insulation requirements to better reflect the different temperatures experienced in each zone. These follow territorial authority (local government) boundaries.
H1/AS1 residential updates
Those involved in the design and construction of new builds will need to take into consideration the following:
What does this mean for floors?
Slab on grade (concrete)
*The R-value is the building industry term for thermal resistance. R-value can be given for a material or for an assembly of materials (e.g. a wall or a window). R-values are additive for layers of materials. The higher the R-value the better the performance.
Suspended floors (timber joist)
What does it mean for walls?
What does it mean for roofs?
What does it mean for windows?
Window minimum compliance in climates 1 – 4:
Window minimum compliance in climates 5 – 6:
or
No longer complies – anywhere
Window requirements, however, are undergoing an interim step-change as follows:
What will the updates achieve?
These changes are intended to significantly reduce (up to 40%) the amount of energy required to heat and cool homes.
How will compliance be demonstrated?
There are three pathways under H1 to demonstrate compliance – schedule, calculation, and modelling. The scheduling method will require the highest levels of insulation and does not provide an understanding of how a building will perform. The modelling method must be used for buildings with a glazing-to-wall ratio of over 40% but can be used for any building. Modelling allows for an optimised design, with a good understanding of actual building performance and its impact on users, and offsets building envelope heat loss with heat solar and internal heat gains.
When will the updates take effect?
Following public consultation, MBIE is extending the time to comply with new wall, floor, and roof insulation requirements for housing by a further six months. This change to the transition period has been made in recognition of pressure on the residential construction sector.
From 1 May 2023 new building work in homes must meet the new wall, floor, and roof insulation performance requirements. Window and door insulation requirements will see a staged implementation process beginning 3 November this year.
Construction in the upper North Island (climate zones 1-2) will keep to the previous timeline, with windows and doors requiring an interim minimum R value of 0.37 by 3 November 2022, and further requiring a minimum R value of 0.46 by 2 November 2023.
Construction in the rest of the country (climate zones 3-6) will now also have an interim increase. These zones will be required to reach a minimum R value of 0.37 for all windows and doors by 3 November 2022 and increase this to R0.46 (zones 3-4) and R0.50 (zones 5-6) six months later, on 1 May 2023.
By 2 November 2023, windows in new housing will be required to meet the increased performance levels for all parts of the country.
The amended Fifth Editions of Acceptable Solution H1/AS1 and Verification Method H1/VM1 are due to be published soon. To keep up to date, visit the MBIE website, or speak to one of our experts at hello@context.nz.
Copyright 2023 Context Architects Ltd.
We use cookies to improve your experience. By continuing to use the Context website, you agree to our use of cookies in accordance with our privacy policy.
Cookie | Duration | Description |
---|---|---|
cookielawinfo-checkbox-analytics | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Analytics". |
cookielawinfo-checkbox-functional | 11 months | The cookie is set by GDPR cookie consent to record the user consent for the cookies in the category "Functional". |
cookielawinfo-checkbox-necessary | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookies is used to store the user consent for the cookies in the category "Necessary". |
cookielawinfo-checkbox-others | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Other. |
cookielawinfo-checkbox-performance | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Performance". |
viewed_cookie_policy | 11 months | The cookie is set by the GDPR Cookie Consent plugin and is used to store whether or not user has consented to the use of cookies. It does not store any personal data. |
You can see how this popup was set up in our step-by-step guide: https://wppopupmaker.com/guides/auto-opening-announcement-popups/
You can see how this popup was set up in our step-by-step guide: https://wppopupmaker.com/guides/auto-opening-announcement-popups/
You can see how this popup was set up in our step-by-step guide: https://wppopupmaker.com/guides/auto-opening-announcement-popups/