Brief
Replace social houses near their end of life with more modern, warm, and dry homes for families and future generations in Hastings
Future-proof social housing in Hastings
This larger-scale regeneration project for 44 new Kฤinga Ora homes saw us work with local consultants to develop masterplan options for extending a cul-de-sac and stitching two existing streets together, creating a gently curving spine fronted by new homes.
Best-practice urban design principles led us to consider carefully placed standard homes (designs developed alongside Kฤinga Ora), to offer a range of housing for the local community.
The development includes one-bedroom, two-bedroom, three-bedroom, four-bedroom and five-bedroom properties. The new houses foster a strong sense of community and create a successful new street.
We worked with our clients and the wider consultant team to deliver this through the full design phase, with construction completed in May 2021.
Services